ChrisH

My blog posts

This user hasn't created any posts.

Comments I've made

Does anyone know where the concrete in the deck had been removed below the re-bar? (Where was it wobbling the most?) In most places only the top two inches were being removed for resurfacing. In...
You guessed it... From CNN: "Construction crews resurfacing the Interstate 35W bridge reported the structure began to wobble as they removed pavement from it, the severity of the wobble increasing...
In 1974, I lived at 600 University Ave. when I attended the UofM. To cure my loneliness I often walked down along the river under Bridge 9340. I would look up in awe, pondering the close packed...